Tube Boiler Installation - A 60m boiler house, constructed from 350t of steelwork, only allowed for tight manoeuvring space. The bogey was mounted on railway lines welded to the steel hanging rods at the top of the boiler house. A crane moved the boiler into position and the weight was transferred to the strand jacking system.