Vanguard competes on an international level when it comes to
heavy lifts and the moving of complex machinery. The process
involves more than simply lifting. Detailed rigging
studies are carried out beforehand to ensure that every
eventuality is catered for and that the best, most
appropriate, cost-effective and practical solution is
delivered.
This division is supported by a fleet of specialised trucks
and trailers, including the Goldhofer modular trailer
system. The imported, multi-axle trailers are the
first of their kind in the country. Cost-effective with high manoeuvrability, the trailer system has an on-site payload capacity of 1300t, boasts 42 axle lines, 4 x 650hp prime mover tractors, and can be configured into various combinations to suit the project and application.
Equipment Used
In addition to its expertise and wealth of experience,
Vanguard utilises specialised equipment to complete projects
safely and effectively. The equipment includes:
 |
Hydraulic
gantries |
 |
Strand jacks –
operated by a smart control lifting system.
Up
to
25 strand jacks can be added to complete
lifts of up
to 3000t and lifts can occur
from any height |
 |
Jack and slide
equipment including jacks, rams, and
hydraulic power packs (diesel or electric)
ideal for use in
remote locations |
 |
Diesel
generators |
 |
Self climbing
jacks |
|
Unique Solutions
 |
In 2007 Vanguard completed a record-breaking feat of moving
a 600t research vessel from the shipbuilder’s warehouse to
the synchrolift at the Cape Town Waterfront.
The ship, measuring 16,5m high, 10,2m wide, and 43,2m long,
was transported by the Goldhofer modular trailer system. Two
6 axle trailers, side by side, transported the heavier stern
section, while the bow rested on one 12 axle trailer. The
15m gap between the trailers was bridged by hydraulic
cables. Read more ...
|
 |
In 2005 Vanguard completed Africa’s highest non crane
assisted lift in Zambia during the hoisting and positioning
of a 59m long, 155t cold box at Mopani Copper Mine. The box
was lifted as a single structure with a hook specifically
designed and manufactured by Vanguard for the job, and four
70t capacity strand jacks.
Read more about this project. |